The concept blueprint above is not a budget. A real campus — land, building, systems, and landscape — runs into several million dollars before the first student arrives. That is true for any new school of this quality, and it is worth stating plainly rather than hiding inside a smaller pilot number.
The pilot budget of $662,900 is scoped as one year of operations and interior retrofit inside a leased, donated, or hosted non-residential space. It does not buy a site, and it does not convert the founder's home into a school: residential zoning and homeowners' regulations make a home-based facility a poor legal and operational fit. The home near Nashville remains base operations only — curriculum recording, planning, guide training, and advisory meetings.
The capital phase — site acquisition, construction or major renovation, building-technology integration, outdoor learning infrastructure, and landscaping — is a separate fundraising and planning track that begins only after the pilot proves the method.
Corporate donations of equipment or software can lower the visible technology budget, but they do not replace the expert time required to design and commission a high-performance campus. That professional time — architects, building-technology engineers, acousticians, landscape designers, and systems integrators — would cost many multiples of the pilot's $73,400 technology line.
See the pilot budget → |Why Franklin/Brentwood? →